The main purpose of the project is to achieve a highly impressive image of the footbridge while fully respecting the challengingly low budget. The architectural composition is comprised of two parts – a basic one- over the boulevard and secondary one- a connection to the adjacent building. The visual mass is achieved by a spatial tube of galvanized steel frames wrapped in a galvanized mesh.

Project details
Status
Third Place
Total Built Area
---
Client
Sofia Tech Park AD
Year
2014
Top